Cost Estimator

WORK SMARTER, FINISH FASTER, AND SAVE

Just like the DensElement® Barrier System was installed faster in a controlled laboratory setting, you could obtain substantial installation savings on your jobsite too. Scaling these study results to a building project with 20,000 sq. ft. of gross wall area or more could quickly increase your bottom-line savings.
Removing an installation step could save a significant amount of installation time, allowing you to finish projects faster and move onto the next jobsite quicker.
Eliminating the need for a full fluid barrier reduces installation time, saves labor and materials, and lowers the bottom-line cost of your project.
Ultimately reduce safety concerns by spending less time on the jobsite and in elevated positions